Heiges Field House Elevator Modernization
The project will consist of the existing elevator operating system, and
cab being removed. A new ICON control and landing system will be installed.
The
hall stations will be replaced to meet ADA. and 2000 ASME requirements. Cab
will be modernized with stainless steel panels, hand rails on three walls,
and a new suspended ceiling. All hoist way wiring, travel cable, and car wiring
will be replaced.
Heiges
Field House Arena AHU Upgrade
The four air
handlers that currently serve the arena will be replaced. The units will provide heating and fresh
air. They will also have the capacity to
have cooling coils added, if air conditioning is added to the arena in the
future. The air handlers are located in mechanical/storage rooms adjacent to
the arena.