Seth Grove Stadium Asphalt Repair/Replacement 

Resurface front of Seth Grove stadium bleachers

 

Resurface north end of stadium to several feet beyond/outside ticket booths

Drainage improvement and resurface back of north end

 

 

Pave existing gravel area located behind stadium at south end

 

Project includes a combination of asphalt removal, repair, and overlay of asphalt. Depending on location one or all of these processes will be worked. A trench drain is planned for drainage improvement.

Tentative schedule for planned work is mid June 2008, following Relay for Life weekend.